ED

Installation Survey & Sign-off

EazyDrop Field Deployment Record
TICKET ID β€”
New Survey
Past Records
1Project
2Space
3Power & Security
4Before Photos
5Design
6Schedule & NOC
7Units Installed
8After Photos
9Sign-off
01

Project & Building

Basic site identification
02

Installation Space

Where the unit physically goes
Outdoor β€” additional checks
03

Power & Security

Utilities and site oversight
04

Photos β€” Before Installation

Three required angles of the empty space
1. Front view
0 photos added
2. Right side view
0 photos added
3. Left side view
0 photos added
05

Design / Wrap Needs

Cosmetic finishing requirements
06

Schedule & NOC Status

Timing and approval
Long-term contract details
07

Units Installed

Enter quantity of each model β€” sizes are fixed, no need to count manually
Total compartments (calculated)
Editable below if final count differs
0
Large
0
Medium
0
Small
0
X-Small
0
08

Photos β€” After Installation

Same three angles β€” confirm final placement, level, cable routing, wrap
1. Front view
0 photos added
2. Right side view
0 photos added
3. Left side view
0 photos added
09

Sign-off

Whoever is on-site today signs their part β€” survey and install can be different people, different visits

Surveyed by (site visit)

Installed by (installation visit)

Manager Login

Required to edit or delete a record from a previous day.